Realisation biotalys

Due to noise complaints from local residents, EVA International conducted a noise study into remediation. Based on the remediation plan, we proposed and implemented the following solution.

Installation of sound barrier with absorption on the inside, 5m high around the cooling installation.

  • With sliding door for maintenance of the machines.
  • With the necessary attention to stability against wind (southwest oriented).
geluidswand met absorptie

Convinced of our
quality and services?