Referenties/
AGC HQ Offices
Grid of melaminefoam baffles in a 6000m² office project with a stiff suspension of own design. Also applied in the restaurant and selfservice. Total project 20.000 baffles installed in 4 months.
Grid of melaminefoam baffles in a 6000m² office project with a stiff suspension of own design. Also applied in the restaurant and selfservice. Total project 20.000 baffles installed in 4 months.